Lobito Tomboco PMS

Pipeline Management System

Client/Operator Chevron / Cabinda Gulf Oil
Country Angola
Delivery 2007
Integration Yokogawa topside control system
Vetco Gray subsea control system
Model (OLGA)

12 production wells and 5 production lines
3 topside separators
Gas lift network with 3 gas lift lines
and 12 wellbore annuli
Water injection network with 3 distribution lines
and 11 water injection lines

Modes Real-time
Look-ahead
Planning
Applications

Transparent production system
Virtual metering
Cool-Down advisor
Gas-Lift advisor
Alarm system
Tuning system


Lobito Tomboco edpm includes the un-measurable Transparent Pipeline variables in the time-varying profile plot.


Lobito Tomboco edpm with the in-built Virtual Metering System (VMS) predicting gas, oil and water flow rates for each of the production wells.

BBLT Project

The BBLT Development is one of Chevron’s “Big 5” Projects.

 

Located approximately 80 km offshore in approximately 400 m of water, the project has been developed in two phases. First phase developed the Benguela and Belize fields directly from a new integrated drilling and production hub facility and first oil was produced from Belize field in January 2006.

 

The Lobito and Tomboco fields are produced via subsea wells tied into the central production hub and the control and operation of the production system is supported by SPT Group’s edpm product. With Lobito and Tomboco online, daily production from the facility is expected to peak at approximately 200.000 barrels of oil per day.