Ga direkte til innhold

Blind Faith FMT

Flow Management Tool

Client/Operator Chevron
Country USA
Delivery 2008
Integration

Allen Bradley PLC with Wonderware GUI for the topside control system
FMC Technologies subsea control system

Model (OLGA)

One drill center with 4 wells and 2 pipelines
Topside separators

Modes Real-time
Look-ahead
Planning
Applications

Transparent production system
Virtual metering
Cool-Down advisor
Depressurization advisor
Dead-Oil inventory advisor
Erosional velocity advisor
Non-hydrodynamic slugging advisor
Pig tracking advisor

Blind Faith Project

The Blind Faith discovery is located in the Gulf of Mexico, Mississippi Canyon 696, approximately 160 miles (257km) southeast of New Orleans, LA.

 

The water depth in the area is approximately 7000 ft (2134m).

 

The Blind Faith development consists of a Production Drill Centre tied back via two insulated flowlines to a semi-submersible host facility.

 

Chevron's partner in the Blind Faith project is Kerr-McGee Corp., which holds a 37.5 percent interest.