Ga direkte til innhold

The slideshow requires Macromedia Flash Player 7.Download Flash Player 7 to view the artwork in a slideshow, or click the thumbnails below to view the artwork one by one.
 

edpm

eField Dynamic Production Management
(OLGA Online) for multiphase production systems

edpm is rapidly becoming the industry standard for multiphase dynamic production management systems. Using OLGA in an online environment, edpm provides operators and engineers with information from parts of the production system that instrumentation cannot reach, allowing the development of advanced operation advisors based on SPT Group’s accumulated knowledge of field production. An open structure gives ready access to third party software developers and operators, enabling further innovations.

Currently edpm has been used on 18 projects around the world, ranging from gas-condensate and deepwater oil systems to advanced drilling operations. edpm has been proven to optimize production and reduce costs.

 

The Future of Production Management

The future of production management systems will be accessed through edpm technology with automated solutions to optimize returns on investments and avoid production disruptions.

edpm distributes 25 years of flow assurance development and verifications to operators, production engineers, supervisors etc.

Why edpm?

Some of the benefits achieved:
- Stable operation and optimized production
- Reduced number of unplanned shutdowns
- Faster recovery on start-up
- Advanced warning of abnormal situations
- Expanded operating envelope
- Optimized inhibitor and gas injection
- Improved short-term production forecasting
- Reduced uncertainty – better decision making
- Extensive virtual instrumentation and fall-out strategy
- Focal-point for multi-discipline knowledge building

 

 

edpm Brochure

 

 

 

Key Points

 

Dynamic eField solutions taking flow assurance to operations

  • Optimize production
  • Avoid critical disruptions
  • Support remote operations
  • Maximize return on investment

 

Some Example Projects

  • Optimized use of LDHI - reduced OPEX
  • Optimized injection of MEG - reduced to 50%
  • Extended field life with more than 10 months
  • Payback time less than one month
  • Increased production and regularity
  • Superb transparent window into the subsea production system
  • Look-Back Mode that further increases the VMS accuracy