Ormen Lange edpm Project
Continued success for Ormen Lange Flow Assurance System.
The Ormen Lange FAS (Flow Assurance System) was installed in November 2007. Since then the FAS has been tuned against the field data and used extensively for operational support.
The Ormen Lange FAS was developed by FMC Technologies and SPT Group whom also execute the long term maintenance and support agreement for Shell.
"The Shell Operations Support Team finds the Flow Assurance System (FAS) very useful in monitoring, surveillance and optimization of Ormen Lange production. As a part of the FAS, the inbuilt Pipeline Management System adds significant value in the daily decision making and minimizes the potential flow assurance risks. We are pleased with the support from the FAS suppliers, FMC Technologies and SPT Group."
Cathy Burns, Flow Assurance Engineer, Shell
Read more information about the Ormen Lange FAS at http://www.sptgroup.com/en/Products/edpm/References/Ormen-Lange-PMS/
Contact Knut Erik Spilling at
for any questions regarding this press note.

©StatoilHydro