The release includes several usability enhancements and workflow improvements.
January 12th 2010
As of today MEPO version 3.3 is available for download.
Read the full Press Release
Please contact your SPT Group office for access information.
Go to the download page to install the new version.
Some highlights from the release:
Usability Enhancements and Workflow Improvements
Link to MBAL
• New interface to MBAL (Petroleum Experts) available
Spreadsheet Support
• Include spreadsheet calculations as part of the work process (write/exe/read)
• Excel and Open Office Calc are supported
MEPO plugin for Petrel
• Extend the uncertainty and AHM workflows right back to the geo model
• Comprehensive documentation and support material
Analysis
• Improved line plot panel
• Support of 2D plots
Uncertainty Parameter Panel
• New distribution editor
• Help functionality included for all settings
Manual Runs
• Launch and post process manually created simulation cases
• Used for rapid testing without having to configure a full MEPO run
Project consistency checking
• Easily identify if the project is properly set up and ready to launch
Neural Net Support
• Neural Net included as an alternative to polynomial response surface modeling
Simulation Control Centre
• Method selection, simulation and result management now easily controlled from
one single panel
Objective function tuning
• Easy inspection and tuning of global objective function using a reference
(base case) simulation model
Evolution Strategy
• Easier set-up. Choose between coarse and fine tuning
• New feature allowing more efficient identification of alternative match realisations
New Post Processor
• Significant speed up for medium and large simulation models
• Enhanced log messaging